Demolition crews recycle almost all of Windsor’s former city hall
![](https://rpra.ca/wp-content/uploads/construction_helmet-Copy-810x266.jpg)
The concrete and brick was crushed on site to create a safe material to fill the hole left from the 70,000-square-foot structure. Read more here.
The concrete and brick was crushed on site to create a safe material to fill the hole left from the 70,000-square-foot structure. Read more here.