Demolition crews recycle almost all of Windsor’s former city hall
The concrete and brick was crushed on site to create a safe material to fill the hole left from the 70,000-square-foot structure. Read more here.
The concrete and brick was crushed on site to create a safe material to fill the hole left from the 70,000-square-foot structure. Read more here.